Mass timber changes the risk profile of a project—and the way insurers look at it. In this practical, step‑by‑step session, we’ll walk through the full process of procuring construction insurance for mass timber projects, from completing the application form and obtaining initial pricing, through technical review and formal quotes. Along the way, we’ll highlight what makes mass timber different as a building material, and how those differences shape insurers’ perceptions of risk and cost.
This session will demystify first‑party risk transfer during construction and explore key risk issues that emerge in the operational phase—many of which can be most effectively mitigated through design and construction decisions made early on.
What You’ll Learn:
- Insight into which factors drive higher perceived risk and insurance costs—and how those drivers differ between the construction and operational phases of a mass timber building.
- A clear view of how their role and deliverables feed into the project’s risk review.
- Concrete examples of what information to include, emphasize or adapt to unlock cost‑effective insurance options.
.png)

more sessions

The Globeville Mixed-Use Development in Denver represents a convergence of community need, environmental equity, and structural innovation.

Cost per square foot doesn't work for mass timber. So how do you know if a project pencils before you spend a year and a small fortune?

Mass timber projects succeed or fail on the design decisions made early. Member sizing and bay geometry drive structural performance, fabrication cost, and erection speed.

Join this expert panel as industry leaders explore how hybrid mass timber construction is shaping the future of building in North America.

This session explores the growing shift from site-built construction to factory-driven delivery in mass timber projects.

In the 5 to 10 story accommodation market (hotels, student housing, residential, social housing), light frame wall systems can't reach that height leaving concrete as the default.

This panel explores the real-world coordination required to deliver a complex mass timber project, using Ullrhof in Aspen as a case study.

Mass timber doesn't have to be the primary structural system to show up in a building
.avif)
.png)