We’re serving up more than just your average conference lunch. Levin Deli (they're famous around here) is serving up a gourmet lunch at the Denver Public Library.
more sessions

The Globeville Mixed-Use Development in Denver represents a convergence of community need, environmental equity, and structural innovation.

Cost per square foot doesn't work for mass timber. So how do you know if a project pencils before you spend a year and a small fortune?

Mass timber projects succeed or fail on the design decisions made early. Member sizing and bay geometry drive structural performance, fabrication cost, and erection speed.


This session explores the growing shift from site-built construction to factory-driven delivery in mass timber projects.

In the 5 to 10 story accommodation market (hotels, student housing, residential, social housing), light frame wall systems can't reach that height leaving concrete as the default.

This panel explores the real-world coordination required to deliver a complex mass timber project, using Ullrhof in Aspen as a case study.

Mass timber doesn't have to be the primary structural system to show up in a building
.avif)
.png)