After a full day of sessions, it’s time to unwind, grab a drink, grab some food, and prepare to get your mind blown—literally.
The Mass Timber Magic Mixer takes over the heart of the Summit’s main venue and exhibitor hall at the Denver Art Museum’s Grand Sturm Pavilion for an evening of jaw-dropping magic, good eats, and even better networking.
Picture this: world-class magicians weaving through the crowd, dazzling you with insane card tricks and sleight-of-hand illusions while you sip on something strong from the cash bar. This isn’t your average end-of-day mixer—it’s a mind-bending experience designed to spark conversations and connections that’ll stick long after the Summit ends.
Step into the magic and let the conversations flow—because the best connections sometimes appear when you least expect them.

more sessions


Cost per square foot doesn't work for mass timber. So how do you know if a project pencils before you spend a year and a small fortune?

Mass timber projects succeed or fail on the design decisions made early. Member sizing and bay geometry drive structural performance, fabrication cost, and erection speed.



In the 5 to 10 story accommodation market (hotels, student housing, residential, social housing), light frame wall systems can't reach that height leaving concrete as the default.

This panel explores the real-world coordination required to deliver a complex mass timber project, using Ullrhof in Aspen as a case study.

Mass timber doesn't have to be the primary structural system to show up in a building
.avif)
.png)